Summary and decision
Give affected groups a clear route to influence decisions.
Decision: Approve participation boundaries, representation and response ownership.
Preparation
- Bring the W01 mandate and employee-group overview without personal profiles.
- List groups missing from previous consultations.
Audience
8-12 people: sponsor, HR, FM, managers, employee representatives and accessibility lead.
Agenda
| # | Block | Minutes |
|---|---|---|
| 1 | Opening | 10 |
| 2 | Evidence | 10 |
| 3 | Exercise A | 25 |
| 4 | Break | 5 |
| 5 | Exercise B | 25 |
| 6 | Decisions | 15 |
| Total | 90 |
Exercises A and B
Exercise A: Stakeholder ecosystem
- Map affected groups, actors, enablers and decision-makers.
- Identify operational, shift, remote and accessibility perspectives.
- Record who is missing and how to reach them.
Exercise B: Participation agreement
- Assign inform, consult, co-design or local decision to each topic.
- Explain what can change as a result of participation.
- Agree who responds to input and by which date.
Worksheets
Worksheet A
- Group and impact
- Role in implementation
- Voice and access barriers
- Representative and route
Worksheet B
- Decision topic
- Participation boundary
- Accessible session format
- Response owner and date
Illustrative example
Illustrative, not a real case
- Illustrative: the building choice is fixed but neighbourhood allocation is open.
- Shift workers receive a paid session during their working hours.
- The team publishes which suggestions changed the design and why.
Completion criteria
- Each affected group has a participation route.
- Decision boundaries are visible before invitation.
- Response ownership includes unpopular suggestions.
Follow-up
- Create the community group and schedule its first review.
- Review representation again after W03 reveals new impacts.
Points of attention
- Consultation does not replace formal employee-representation processes.
- Participation must not imply consensus or an unlimited right to decide.
Workplace phase and change activities
Workplace: Discover (phase in the Workplace method)
Change Management
- Frame
Why this workshop helps: Sets participation boundaries and representation, so decision room is clear from the start.
Adapting outside a workplace setting: Replace workplace examples with situations from your own change; the structure can stay.
These links and notes are editorial guidance of the Codex, not a new or validated template. The workshop text and files on this page are unchanged.
Planned sessions
No sessions are planned.
Sources and downloads
Sources
Damschroder et al. (2022). The updated Consolidated Framework for Implementation Research
Why here: Informs mapping affected groups and their context, barriers and facilitators. Use selected constructs; this does not validate the workshop.
- Finding:
- CFIR supports structured examination of context, barriers and facilitators, with attention to recipients and equity.
- Limitation for workplace:
- Use selected relevant constructs. The 7P lens is our organising synthesis, not the CFIR structure or a validated scale.
Implementation of Activity-Based Workplaces: The Importance of Participation in Process Activities (2022)
Why here: Supports examining participation in implementation activities. It does not prove that more participation sessions cause better outcomes.
- Finding:
- A study followed participation in implementation activities during relocation at two Swedish government office sites.
- Limitation for workplace:
- An observational workplace study supports examining participation. It does not prove that more workshops cause better outcomes.
Downloads
- Facilitation slides (English)pptxEN · v1.0 · AvailableLog in to download
- Facilitation slides (Dutch)pptxNL · v1.0 · AvailableLog in to download
- Worksheet A: Stakeholder ecosystempdfEN · v1.0 · Availablepage 3Log in to download
- Worksheet A: Stakeholder ecosystempdfNL · v1.0 · Availablepage 3Log in to download
- Worksheet B: Participation agreementpdfEN · v1.0 · Availablepage 4Log in to download
- Worksheet B: Participation agreementpdfNL · v1.0 · Availablepage 4Log in to download
- Facilitator guide (English)pdfEN · v1.0 · Availablepages 10-12Log in to download
- Facilitator guide (Dutch)pdfNL · v1.0 · Availablepages 10-12Log in to download
Last reviewed: 2026-10-02