WorkplaceCodex
RecalibrateModellingPlatform-enabled

Spatial Performance Review

The periodic re-assessment of spatial supply against evolved demand, the Diagnose-phase taxonomy discipline operating as a standing review.

Does the spatial supply still match current demand: where has the gap structure moved, and what is the proportionate response?
Why this matters

Supply is fixed at delivery; demand never is. Headcount shifts, teams reorganise, activity profiles evolve, and the setting mix that matched demand at design gradually mismatches the organisation using it. This review re-computes the gap structure on a standing basis, catching mis-provision while the response is a reconfiguration rather than a relocation. It is how the workplace stays matched instead of aging into the next project's 'before' picture.

When to use it
  • Annually as standing review; event-triggered after reorganisations, growth steps or ratio revisions
  • When the behaviour review, booking analysis or pulse converge on a setting-level failure
  • Before any capital spend, the review distinguishes redistribution problems from supply problems
Who should participate
  • Strategist or internal capability running the re-assessment
  • FM and CRE as operational and portfolio owners
  • Finance where findings carry cost consequences
  • Community group validating setting-level interpretations
Inputs
  • Maintained supply model: the kit as delivered plus modifications
  • Current demand evidence: occupancy, booking, pulse, updated headcount and structure
  • Original gap structure and kit evidence chains
  • Behaviour review and booking analysis findings for the same period
What happens
  1. Re-compute supply-demand per setting type using the same taxonomy and classifications (over-, under-, mis-provided, performing): comparability across reviews is the longitudinal value.
  2. Test each setting against its evidence chain: does the kit's rationale still hold under current data?
  3. Integrate convergent evidence: squeeze maps, workarounds and pulse signals located to the same settings.
  4. Track gap trajectory across reviews: a setting drifting toward under-provided over three reviews is a forecast, not a surprise.
  5. Scale responses proportionately: norms and rules first, reconfiguration and redistribution second, kit revision third, capacity last.
  6. Route structural findings into governance: assumption breaches to the register, above-operational responses to leadership.
  7. Update the maintained models so the next review and every regeneration start from current truth.
What to look for
  • Slow-drift mis-provision: no single review alarming, the three-review trajectory unmistakable
  • Demand evolution versus noise: transient turbulence versus a settled new profile
  • Setting failures that are norm failures, don't let the spatial model absorb what the behaviour review owns
  • Local gaps hiding under building-level balance
  • Capital reflexes before redistribution options are exhausted
Outputs
  • Updated gap structure with trajectory against prior reviews
  • Evidence-chain audit
  • Proportionate response plan, layered
  • Assumption register entries for structural movements
  • Updated maintained supply model
How the output is used

Operational responses go to FM; kit revisions regenerate through the maintained models; structural findings feed Assumption Recalibration and, at threshold, the Workplace Strategy Refresh. The longitudinal record is the organisation's spatial memory.

Human judgement required

The platform re-computes the gaps; judgement scales the response. Whether a drifting setting warrants a norm fix, a reconfiguration or a kit revision, and whether demand movement is evolution or noise, are proportionality calls.

Common mistakes
  • Reviewing only when complaints force it, losing the trajectory
  • Changing taxonomy between reviews, destroying comparability
  • Answering every gap with space when norms and redistribution were available
  • Absorbing behavioural failures the spatial model didn't cause
  • Skipping the model update, so regeneration produces fiction
Practical example

A bank's second annual review caught collaboration settings drifting to over-provided while enclosed focus demand climbed, two acquired analytical teams shifting the activity profile. Three-layer response: quiet-protocol extension immediately, four collaboration bays reconfigured to focus enclosures within the quarter, a kit-revision entry in the register. Capital cost: FM's existing reconfiguration budget.

Change in practice

  1. Which spaces are used differently than intended, and by whom?
  2. Which provision or agreement issues explain the gap?
  3. Which measures, with denominators and periods, will track improvement?
Related workshops

Questions are our own practical synthesis. Workshops are original designs for pilot use, not validated for effectiveness.

45 methods in the library.